Bridge monitored for big loads
Trucks detouring around the I-280 closing in North Toledo have prompted city officials to step up enforcement of the five-ton weight limit on the Martin Luther King, Jr., Bridge.
The city s division of streets, bridges, and harbor issued a reminder yesterday that the bridge s deteriorated condition prompted the 1997 establishment of a 20-ton limit, which was further reduced to five tons in 2000 to preserve the King s lift spans until their replacement.
The lift spans are to be replaced this winter.
I-280 is to be closed between Greenbelt Parkway and Summit Street until mid-May. A detour route for local trucks has been posted using Greenbelt, Cherry Street, and Summit, but trucks using that route are directed to take Summit back to the Craig Memorial Bridge.

Facebook