Fill 'Er Up

6/25/2003
ROV cementing 01 - Dain Thunert, sprays a mixture of water, cement and foam into the bottom of the Martin Luther King bridge, to replace the tons of sand and gravel that filled the bridge before. This mixture, all 11,000 cubic yerds of it, will fill the bridge, and wil be covered with stone, cement and blacktop. The Blade/Allan Detrich
ROV cementing 01 - Dain Thunert, sprays a mixture of water, cement and foam into the bottom of the Martin Luther King bridge, to replace the tons of sand and gravel that filled the bridge before. This mixture, all 11,000 cubic yerds of it, will fill the bridge, and wil be covered with stone, cement and blacktop. The Blade/Allan Detrich

Dain Thunert sprays a mixture of water, cement, and foam into the arches of the Martin Luther King, Jr., Bridge to replace the tons of sand and gravel that had filled the arches previously. The mixture, all 11,000 cubic yards of it, will fill the arches, then be paved over.