Jason Harris, of Oregon, and Kamarr Holloway, of Toledo, at work on the west side tower of the bridge. They are replacing batten plates as needed.
The Blade/Jetta Fraser
Buy This Image
Tammy Stierhoff, of Bellevue, left, and Eric Johnston, of Norwalk, bind bridge railing that have been cut from the sides of the bridge.
The Blade/Jetta Fraser
Buy This Image
Gaken Gerken, of Napoleon, left, and Matt Pierson, of Oak Harbor, with a section of the pedestrian railing that is removed by an excavator operated by Dan Newton, of Curtice [not pictured].
The Blade/Jetta Fraser
Buy This Image
Eric Johnston, of Norwalk, de-burring the cut ends of sections of the pedestrian railing.
The Blade/Jetta Fraser
Buy This Image
Looking east from the Anthony Wayne Bridge in Toledo.
The Blade/Jetta Fraser
Buy This Image
A section of the pedestrian railing is removed by an excavator operated by Dan Newton, of Curtice.
The Blade/Jetta Fraser
Buy This Image
Looking east from the Anthony Wayne Bridge in Toledo.
The Blade/Jetta Fraser
Buy This Image
A modular expansion joint that will be installed as part of the re-construction of the bridge. The label indicates it was made specifically for the High Level bridge.
The Blade/Jetta Fraser
Buy This Image
Modular expansion joints that will be installed as part of the re-construction of the bridge.
The Blade/Jetta Fraser
Buy This Image
