Nighttime road work begins Tuesday on I-75

7/21/2014
BLADE STAFF

Nighttime work to prepare for rebuilding a stretch of I-75 near downtown Toledo will start Tuesday night, the Ohio Department of Transportation announced.

Pavement and ramp repairs will occur nightly from 7 p.m. to 6 a.m. the next morning, ODOT said.

For the first three nights, southbound exit and entrance ramps at the Detroit Avenue, Collingwood Boulevard, and Washington Street interchanges may be closed during work hours.

Lane closings might occur on the ramp from eastbound I-475 to southbound I-75, and the two right lanes will be closed on I-75 between I-475 and the Washington exit.

Kokosing Construction Co. holds a $31.4 million ODOT contract for the two-year project.